FUENGIROLA – Malaga, SPAIN
Specifications:
Process engineering for tender works
Capacity:
60.000 m3/d expandable to 100.000 m3/d
Use of produced water:
Human consumption
Produced Water storage:
Two tanks of 5.000 m3
Auxiliary installations:
Flushing and chemical cleaning equipment
Filter cleaning equipment
Mud treatment equipment
Process Description:
Intake:
Discharge:
Pre-treatment:
Ro process:
Energy recovery:
Post-treatment: