The Misratah Stadium was a real challenge since we had to design, fabricate, transport and mount the elements within 10 months.
For this specific project, all was 100% fabricated in Spain before being shipped.
The plot is located on the Mediterranean Sea, on the first sea line of the city of Misratah.
The stadium fulfills all FIFA requirements.